About this app
PTL Television Network, The Voice of the Prophets, aims to draw from all aspects of life, from music to the prophetic, from laughter to tears, from cooking to living, from the highs to the lows, all designed to bring Jesus into your life on every level. As the Word of God declares in Colossians 3:17 –
“Let every detail in your lives—words, actions, whatever—be done in the name of the Master, Jesus, thanking God the Father every step of the way.”
We meet you where you are, just as Jesus did, using new and radical methods to deliver the Gospel without changing the message and providing a platform for today’s prophets.
PTL Television Network features cutting-edge media and classic programming, each one designed to connect the generations. It is not enough for one generation to be reached. Only through unity will the message of Jesus Christ transcend the gap and reach those who need it most.
Downloads
1.2.3.4.5.6.7.8.9.0
LATEST
06/01/2023
Download
71.56 MB
1.2.3.4.5.6.7.8.9.0
LATEST06/01/2023
Supported Architectures
MD5 Checksum
7ad50081237d1033fc919dc7ce79b456
Minimum SDK Version
24
Version Code
2290
Upload Date
Jun 1, 2023, 10:13:09 AM
1.2.3.4.5.6.7.8.9.0
12/30/2022
Download
70.59 MB
1.2.3.4.5.6.7.8.9.0
12/30/2022
Supported Architectures
MD5 Checksum
c18c64cd77c6c3b4b748b01d25ddbbce
Minimum SDK Version
24
Version Code
2180
Upload Date
Dec 30, 2022, 2:08:57 AM
1.2.3.4.5.6.7.8.9.0
10/30/2022
Download
73.61 MB
1.2.3.4.5.6.7.8.9.0
10/30/2022
Supported Architectures
MD5 Checksum
ae4df8afd4133bdb545cb0a568c51cad
Minimum SDK Version
24
Version Code
2155
Upload Date
Oct 30, 2022, 11:07:35 PM
Similar Apps
Guided by Keziah
5.0
everyone
DGG CHURCH
5.0
everyone
TLHC
5.0
everyone
Gay Share Australia
5.0
teen
Bethlehem Baptist Church
5.0
everyone
Shoreline Church App
5.0
everyone
New Life Jesup
5.0
everyone
Elevation Church UT
5.0
everyone
Parlay.
5.0
everyone
Psychic Insights by Christine
5.0
everyone